Laserfiche WebLink
P C <br />~' COLORADO DIVISION OF 1VIIl~TERALS AND GEOLOGY <br />*~+ 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />'i ~a' <br />COAL lYIINING PERMTT -TECHNICAL REVISION DECISION <br />Munger Canyon Mine, Lodestar Energy, Inc. <br />Permit No. C-1981-020 <br />The Division of Minerals and Geology has proposed the decision stated below. Provided there are no <br />objections, the decision will become effective upon the termination of the ten (10) day public comment <br />period, in accordance with Rule 2.08.4(~(b)(iii). <br />Technical Revision No. 14 Decision: Approve with conditions <br />Submittal Date: July 2, 2002 Decision Date: November 4, 2002 <br />Description of Revision: Construct Waste Disposal Pile <br />APPLICATION PAGES MAPS/EXIiIBITS <br />Pages 2.2-7i thru 2.2-7iii, 2.2-10 thru 2.2-12viii Figures 2.2-6, 2.2-7, 2.2-7a <br />2.3-4, 4-Sa 2.2.7b, 4.7-2 <br />Appendix M (vii); pages 1-53 <br />Appendix N; pages 1,2 & 3 <br />Revised Exhibits: table 4.2-3, Vol. 1 Table of Contents, <br />Vol. 1 List of Tables, Vol. 2 List of Figures (TOC-12) <br />CHANGE IN REVISED <br />ACREAGE TOTAL ACREAGE PERFORMANCE BOND <br />Disturbed 4.90 Disttiffbed: 18.76 PnorLiabili $175,596.00 <br />Affected: 4.90 Affected: 552.90 Change in Liability: $41,919.00 <br />Permit: 0.00 Permit: 1,049.00 Revised Liability $217,515.00 <br />State: 0.00 State: 0.00- Bond Held $175,596.00 <br />Federal: 0.00 Federal: 863.50 <br />Private: 0.00 Private: 185.50 <br />DIVISION OF MINERALS AND GEOLOGY <br />Authorized Representative <br />Date: j( OG O Z <br />Stipulation(s) anached,• Provide authorized <br />signature and return the form to the Division. <br />PERMITTEE <br />Authorized Representative <br />Date: <br />C-TR-10 CI981020 DTM 20021105 IOlJ4i AM <br />