My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03638
DRMS
>
Back File Migration
>
Revision
>
REV03638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:32 AM
Creation date
11/21/2007 9:10:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986124
IBM Index Class Name
Revision
Doc Date
12/21/1994
Doc Name
SUCCESSION OF OPERATORS AND FINANCIAL WARRANTY CECIL II GRAVEL PIT PN M-86-124
From
DMG
To
POPEJOY CONSTRUCTION CO INC
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..' <br />-a- <br />IV <br />RFf'TTAI C <br />1. On October 24 <br />1986 permit Number <br />rs-86-1z4 was granted <br />t0 WASHINGTON COUNTY (existing operator) <br />("Permittee"), pursuant to which Permittee has been conducting a mining <br />operation in the County of <br />WASHINGTON State of Colorado. <br />2. Permittee wishes to assign the permit to POPEJOY CONSTRUCTION Co. INC. <br />(new operator), as Successor Operator ("successor") and Successor wishes to <br />become Successor Permittee under the permit. <br />3. Successor understands that the reclamation plan (the "Plan") required by <br />the permit and by applicable State laws and regulations has not been completed <br />and is willing to assume full responsibility for the completion of the Plan. <br />V. AGREEMENTS <br />Permittee and Successor hereby agree, for their own benefit and for the <br />benefit of the State, such agreements to be effective ipSO facto upon the <br />approval by the State of the transfer of the Permit from Permittee to <br />Successor, as follows: <br />1. Successor has inspected the mining and reclamation operations to its <br />entire satisfaction and is fully aware of the conditions thereof. Successor <br />understands and accepts all of the conditions of the Permit. <br />2. Successor will complete the reclamation plan, and hereby assumes <br />liability for completing such plan as to all areas heretofore disturbed, as <br />well as to all areas hereafter disturbed. Successor will perform all of the <br />obligations of the Permittee under the Permit which have not heretofore been <br />performed by Permittee. <br />3. Successor hereby tenders to the State its attached Performance and <br />Financial Warranties°, which are to be substituted for the Performance and <br />Financial Warranties heretofore filed by the Permittee, effective upon the <br />release of the latter Warranties. <br />4. Successor represents to the State that, to the best of its knowledge, <br />information and belief, it is not in violation of any of the provisions of the <br />Colorado Mined Land reclamation Act with respect to any other operation <br />conducted by it in the State of Colorado. <br />
The URL can be used to link to this page
Your browser does not support the video tag.