Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />November 9, 2006 <br />Jerry Nettleton <br />Twentymile Coal Company <br />29515 Routt County Road No. 27 <br />Oak Creek, CO 80467 <br />Re: Foidel Creek Mine (Permit No. C-1982-056) <br />Minor Revision No. 06-212 (MR- 212) <br />Technical Adequacy <br />Dear Mr. Nettleton: <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The subject application was found complete on November 7, 2006. Please address the following <br />technical adequacy items that relate to the subject minor revision application. <br />Item 1. Rule 2.05.3(3)(a) Drawing EX49A-MS shows the reinstatement of an overflow line that was <br />deleted in MR 210. The revision listing on this drawing does not include the MR 210 revision. Please <br />resubmit this drawing to indicate the removal of the overflow line, with a most recent date of <br />revision in the revision list. <br />Item 2. Rule 2.05.3(3)(a) Two page 2.05-45.6e were submitted in the application. Please repaginate as <br />appropriate. <br />Item 3. Rule 2.05.3(3)(a) The reclamation cost estimate sheet submitted in the application had no page <br />number. It has been assigned page A-127, the next consecutive page number. This estimate submitted <br />is $38,583. The Division of Reclamation, Mining and Safety (Division) estimate for the reclamation <br />work is $28,804. The application will be advanced with the estimate submitted unless the Division is <br />advised otherwise. <br />An advance copy of this letter is being provided to you by e-mail. The current due date for a decision on <br />this application is November 17, 2006. Please request an extension to the due date for a decision on this <br />minor revision application so as to provide the Division with ten days after receipt of a response to this <br />adequacy letter. Please contact me if you have any questions. <br />Yours truly, <br />~~~~ ~ r~~ <br />Byron G. Walker <br />Environmental Protection Specialist <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />