Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />t <br />1 <br />1 <br />1 <br />1 <br />1 <br />EYHIBIT E (Cont'd.) <br />Reclamation Timetable <br />The reclamation phases listed in the following table may be <br />correlated to Map Exhibits D-1 and F. The phases correspond to <br />the mining stages and are numbered accordingly. These are esti- <br />mates only, and variations may occur. <br />Reclamation Time .able <br />Reclamation <br />Phase <br />lA <br />1B <br />1 Subtotal <br />zn <br />2B <br />2 Subtotal <br />3 <br />Years <br />5 <br />2.51 <br />o.4s <br />5 2.99 <br />S 2.26 <br />Acres <br />Slope Road Revegetated Total <br />. ~~~ , <br />3.53 10.01 ~ i ^`~ <br />1.11 3.97 <br />4.64 13.98 13.98 <br />8.13* <br />5.53 <br />13.G6 <br />6.96 <br />4A 0.46 2.37 <br /><1B 1.10 4.05 <br />4 Subtotal 5 1.56 6.42 <br />5 5 3.18 8.71 <br />6 5 2.14 10.19 <br />Stockpile Area 1 - 0 3.54 <br />Stockpile Area 2 - 0 4.45 <br />Access Roads 0 1.41 1.41 <br />Total 30* 16.77 1.41 69.32 <br /> t ~Yi7_ <br />Mined before 1976 laws 1.54 16.20 <br />*Does not in clude 1B acreage previously counted. <br />13.66 <br />6.96 <br />6.42 <br />8.71 <br />10.19 <br />3.54 <br />4.45 <br />1.41 <br />69.32 <br />16.20 <br />The total reclamation period of 30 years indicates individual <br />times by stages. Some reclamation periods will overlap and be in <br />progress at the same time. Therefore, 30 years is a maximum esti- <br />mate. It is expected that reclamation will be completed in a <br />shorter time. <br />19 <br /> <br />