EXHIBIT E (Cont'd.) <br />' is complete, and that seed planting will be completed the follow- <br />ing April. During the remaining years of each reclamation phase <br />' (usually about 3-1/2 years), Robco will monitor the revegetative <br />growth to insure that reclamation as planned is successful. <br />' The soil stockpile areas will be reclaimed as soon as the <br />area is not necessary for stockpiling. Soil Stockpile 1 area <br />will be reclaimed after Stage 4 is resoiled, and soil Stockpile 2 <br />' area will be reclaimed after Stage G is resoiled. Revegetation <br />will be the same as the rest of the area. <br />' The access roads will be ripped and revegetated as soon as <br />any segment of the road can be abandoned. Approximately half <br />' of the existing roads will be in use during the entire life of <br />' the mine, and reclamation mill occur at the same time as <br />reclamation of Phase 6. <br />' Reclamation Standards <br />' Backfilling and grading will create a topography that is <br />compatible with the final land use. Slopes will be a maximum of <br />' 2 to 1; most of the slopes will be flatter than 3 to 1. <br />This operation will have no drill holes or auger holers <br />1 that remain after reclamation. There are no addits or shafts. <br />' There are to be no earthen dams. <br />No toxic or acid-forming material will be encountered or <br />' used in this operation. <br />All refuse will be disposed of by hauling it away or by <br />' burying it in the backfill areas so that unsightliness and <br />' deleterious effects will be controlled. <br />16 <br />