My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-11-13_REVISION - M1992069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992069
>
2003-11-13_REVISION - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:15 PM
Creation date
11/21/2007 9:09:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Revision
Doc Date
11/13/2003
Doc Name
Addition to Technical Revision 04
From
Paragon
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PARnG ON <br />CONSULTING GROUP <br />SENT VIA CERTIFIED MAIL <br />Certified Number 7002 2410 0007 8773 5519 <br />November 11, 2003 <br />Ms. Kate Pickford <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />PSERVIGE, QUALITY, AND 1NNOVATIGN° <br /> 1103 Oak Park Drivc, Suia 110 <br /> Fon Collins, CO 80525 <br /> PM1ane(9]0)3]]-1600 <br />~~ <br />RECEIVED Fax (970) 377-1880 <br />' www.Pam6oncR.com <br />NOV. i 3 2003 DAVID M. RAU, P.E., DEE <br />Scorr A. RUTHERFORD, P.E. <br />L ~ BRICK SMITH, P. E. <br /> <br />Division ~f Minerals and Geelagy JAMES M. THOMAS, P.E. <br />BRAD C. WOHLER <br /> STEVEN A. MANE, P.E. <br /> AMT D. WEBER, P.E. <br /> I'IEATHER $. ALDERMAN <br /> KATHLEEN $. THEISEN, E.1. <br />RE: Groundwater Monitoring Plan <br />Aggregate Industries F Street Facility (83`d Joint Venture Pit) <br />4509 F Street, Greeley, Colorado <br />Project Number l 001018 <br />DMG Permit No. M-1992-069/Addition to Technical Revision 004 <br />Dear Ms. Pickford: <br />The purpose of this letter is to propose to the Division of Minerals and Geology (DMG) a <br />plan for additional groundwater monitoring at the above-referenced site on behalf of <br />Aggregate Industries. As you know, the DMG has requested that Aggregate Industries <br />resume groundwater monitoring at the site once dewatering ceases in the area of the 2001 <br />diesel-fuel release to confirm that significant groundwater contamination is not present. The <br />following plan was developed based on the on-site meeting held on September 26, 2003; the <br />DMG's Inspection Report for that meeting; and a telephone conversation with you on <br />November 6, 2003. At this time, it is anticipated that cessation of the dewatering activities <br />will occur in 2005. <br />• Two (2) additional groundwater monitoring wells will be installed at the site for future <br />monitoring. Those wells will be installed on the northwest and southeast sides of the <br />former abatement excavation in the vicinity of soil samples North Wall West End and <br />South Wall Middle, respectively. <br />ENVIRONMENTAL ENGINEERING AND GEOHYDROLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.