Laserfiche WebLink
Mr. Jim Burnell <br />May 2, 2005 <br />Page 3 <br />feet above and below the water-bearing zone. Based on my inspection, MCC is in compliance <br />because they aze using a CDMG approved fill material for the remainder of the hole above the <br />bridge plug and cement plug. I recommend that MCC specifically indicate whether or not the <br />remainder of the hole above the bridge plug and cement plug will be entirely filled to the level of <br />the surface plug. If they aze not entirely filling the hole above the bridge plug and cement plug, <br />then the procedures used should be cleazly identified in the Annual Operating Plan. <br />Please let me know if you have any questions regazding this review. I would be glad to discuss these <br />recommendations with Michael Peacock of MCC if you think that might be helpful. <br />c: Sandy Brown <br />