DS9: <br />The DS9 channel is located on the west side of the Lower Bench. The channel will <br />control runoff from the bench area west of DS8. The estimated geometry of channel DS9 <br />is a 2-ft base, a 0.3 ft depth, and side slopes of 3H:1 V. The channel will be constructed <br />within the bench materials of silt to cobble-size shale fragments and will be seeded to <br />establish native vegetation. <br />4.0 OUTLET DESIGN <br />The stormwater control plan at Logan Wash Mine focuses on the collection and diversion <br />of storm runoff in channels that convey the water to several main discharge points or <br />outlets. These dischazge points include DP1 and DP2 which dischazge runoff collected <br />from upper subbasins off the lower high wall into a lower subbasin (A7), and dischazge <br />points DP3, DP4, and DPS which dischazge runoff into natural ephemeral drainages. <br />Outlet design calculations were conducted for channel DSS and outlet channels <br />(discharge points) DP3, DP4, and DPS. Calculations for DSS were conducted because of <br />the potential high flow velocity in this channel, construction in unconsolidated waste rock <br />and fill, and its location immediately upstream of discharge point DP3, where a sharp <br />increase in slope will occur. <br />Outlet design focused on riprap sizing needed to armor these high velocity <br />channels/outlets. Two equations were used to approximate riprap size. The "Abt <br />equation" (Abt and Johnson 1991) was used because of the steep conditions of the outlet <br />channels. For comparison purposes, the Army Corps of Engineers {ALOE 1994) riprap <br />equation was also used. Tables 5.0 and 5.1 show the parameter input values and results <br />of the calculations. As anticipated, the calculations show that large riprap sizes are <br />' required in the steep outlet channels. Side slope riprap sizes aze slightly less (see Table <br />5.0). <br />The design criteria for riprap are summazized as follows: <br />• The design DSo size for outlet channels DP3 and DP4 is 1.8 and 2.0 ft, <br />respectively. The embankment side slope Dso riprap size is approximately 1.9 fr. <br />• The design D5o size for bottom channel and side slope DSS and DPS is <br />approximately 0.7 ft. <br />• Specific gravity of riprap material shall be no less than 2.3. <br />• If available and reasonably cost-effective, riprap will be angular and not rounded. <br />• Riprap thickness will be twice the DSo size, plus or minus 15 percent. <br />' • A geotextile fabric will be installed after grading and compaction of each outlet <br />channel surface, riprap will be installed directly on the geotextile fabric. This <br />specification may be removed if the fabric prevents effective anchoring of the <br />riprap on the steeply sloped channels. <br />• To optimize placement and stability, riprap will be installed both mechanically <br />and manually, where feasible. <br />Western Water & Land Inc. 14 <br />