My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03476
DRMS
>
Back File Migration
>
Revision
>
REV03476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:19 AM
Creation date
11/21/2007 9:08:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
6/24/2003
Doc Name
Technical Revision Approval
From
DMG
To
Climax Molybdenum Company
Type & Sequence
TR13
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />I/~~NI ~ DIVISION OF MINERALS AND GEOLOGY / <br />I Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />Mr. William D. Rech <br />~o'- Climax Molybdenum Company r/ <br />P.O. BOX 68 <br /> COLORADO <br />DIVISION OF <br />June 24 <br />2003 MIN <br />RAL S <br />, E <br /> GEOLOGY <br /> 0.EC LAM ATION•MINING <br /> SAf ETY•SCIENCE <br />Empire, CO 80438 <br />t/ ~ / <br />Re: Henderson Mine, Technical Revision Approval, Permit M-1977-342, Revision TR-13 <br />Deaz Mr. Rech: <br />Bill Owens <br />Governor <br />Greg E. Watcher <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />On June 24, 2003 the Division of Minerals and Geology (DMG) issued conditional approval of the Technical <br />Revision application submitted to the DMG on June 5, 2003, addressing the following: <br />• Establishment of a new location for the south topsoil stockpile. <br />• Crushing and screening of road base from the Henderson Gravel Pit. <br />• Construction of haul roads and temporary interceptor canal crossings for the topsoil hauling project. <br />• Relocation of temporary topsoil piles into long tern stockpile locations. <br />The following condition to approval was originally applied in a letter from the DMG to Henderson dated October 2, <br />2002, and referenced by Henderson in the TR-13 application. It is reiterated here for tracking purposes through the <br />DMG permit revision database. <br />STIPULATION NO.01: <br />At the beginning of April and again at the beginning of May during each year that the Interceptor Canal <br />is impinged by the temporary culverts and crossings, the snowpack will be evaluated by reference to the <br />Jones Pass and Glen Maz Ranch (Summit Ranch) Snotel sites. If the snow/water equivalent at either of <br />these sites exceeds 125 percent of average, Henderson will consult with DMG about the potential need to <br />remove the temporary culvert and crossing from the Interceptor Canal prior to intensive snowmelt runoff. <br />This consultation may include a requirement to model and estimate the flows in the canal that would <br />result from snowmelt anticipated based on the Snowtel data. <br />The terms of the Technical Revision No. 13 approved by the DMG aze hereby incorporated into Permit No. M-1977- <br />342. All other conditions and requirements of Permit No. M-1977-342 remain in full force and effect. <br />If you have any questions, please contact me. <br />Sincerely, <br />G~ <br />Allen C. Sorenson <br />Reclamation Specialist <br />cc: Erich Bower, Henderson Mill (via email and regular mail) <br />Cazl Mount, DMG (via email) <br /> c:lacs~ivly Documents~henderson h13 appvl.doc <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.