My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03450
DRMS
>
Back File Migration
>
Revision
>
REV03450
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:17 AM
Creation date
11/21/2007 9:08:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981108
IBM Index Class Name
Revision
Doc Date
5/15/2001
Doc Name
COST SUMMARY FORM
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiuiii <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 15-May-2001 Permit or job no. <br />User : ESC Abbreviation <br />Filename <br />Agency or organization name :Division Of Minerals 8 <br />Permit or job action :112 Conversion Applic <br />• <br />M-81-108 Site :Beech Hill Quarries <br />none Slate :Colorado <br />M708-000 County:Larimer <br />Geology <br />TASK LIST (DIRECT COSTS) <br />N0. ~ TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 '-Backfill 8 Grade Disturbed Area dozer 2 101.84 $29,224 <br />002 -Replace Topsoil/Screened Material dozer 2 44.92 $12,891 <br />003 -Revegetation revege 1 40.00 $14,006 <br />004 ~ MobilizatiorVDemobilization mobilize 1 4.86 $2,060 <br />I I I <br /> I I <br /> <br /> <br /> <br /> I <br /> I ~ I <br />_ I I _ <br /> I <br /> <br /> I <br /> I I <br /> I i <br /> <br /> i <br />I I ' <br /> I <br /> <br /> I <br /> <br /> I <br />• inGuoes inflation Ydctor aojusUnent or: NA <br />INDIRECT COSTS <br />SUBTOTALS : 191.62 $58,781 <br />TOTAL DIRECT COST•=~ $58,181 <br />OVERHEAD AND PROFIT- LIabllfty InSUranCe : 1.55 % Of direct total = $902 <br />Performance bond : 1.05 % of direct total = $611 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $5, 818 <br />• not requiretl (or eqp operator serves as super.! TOTAL O 8 P = $7, 331 <br />CONTRACT AMOUNT (tlirect+08 P)= $65,512 <br />PROJECT MANAGEMENT - <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $3,276 <br />coNTINGENCV- NA' NA total= NA <br />contingencies aCGOUnfetl for al task level TOTAL INDIRECT COST = $10,606 <br />TOTAL BOND AMOUNT (direct + indirect) = 568,787 <br />
The URL can be used to link to this page
Your browser does not support the video tag.