Laserfiche WebLink
MR. MIKE SAVAGE <br />Page 3 <br />February 16, 1981 <br />2) 'ihe mining in pit 1 is expected to be coaq~leted by the end <br />of March with backfilling commencing imrediately thereafter. It <br />could be expected that backfilling, topsoiling and revegetation <br />will be completed within 30 days. Zhe stockpile storage area <br />will be topsoiled after all the overburden is removed and re- <br />vegetated as per the approved plan. <br />3) TBM has been notified of the results of your inspection and <br />they will take the steps necessary to solve the problem. <br />Fifer to Imbert Liddle's Dece-tuber 8, 1980 menb. <br />1) Please refer to the new application subtittal for the revised <br />sediment control calculations. <br />2) ZSM will riprap the terminus of Ditch 22-D6 with a Dso value <br />of at least seven (7) inches. <br />3) No response necessary. <br />4) No response necessary. <br />5) No response necessary. <br />6-8) The information has been presented in the new application <br />submittal, please refer to the submittal for design specifications. <br />9) See Number 8 above. <br />10) See Number 8 above. <br />11) No response necessary. <br />12) TBM is in the process of obtaining the necessary information <br />to detronstrate that this was a 10-year, 29-hour precipitation <br />event. Also, please refer to the new application submittal <br />for design. <br />13) See Number 8 above. <br />14) No response necessary. <br />Fdobert fiddle's mean of DecemUer 18 (19?), 1980. Numbering of <br />these items follavs those of the memo. <br />6) No response necessary. <br />