2.04.11 Fish and Wildlife Resources Information V 5, T 11
<br />2.04.12 Prime Farmland Inves ~ don V 5, T 9
<br />2.05.2 Operation Plan: Estimated Area for Life of V 6, T 12
<br />O eradon
<br />2.05.3 Operation Plan: Permit Area V 6, T 12 * Operation Plan
<br /> 2.05.3
<br />2.05.3 1 Production Methods and ui ment V 6, T 12
<br />2.05.3 2 O erations Descri don V 6, T 12
<br />2.05.3 3 Mine Facilities V 6,6a,7 , T 13
<br />2.05.3 4 Ponds, Itn undments, Diversions V 6, T 13
<br />2.05.3 5 To soil removal and sto V 9, T 21
<br />2.05.3(6) Overburden V 2, T 6;
<br /> V8,T14;
<br /> V9,T20;
<br /> V9,T21
<br />2.05.3 Coal Handlin Structures V 6, T 13
<br />2.05.3(8) Coal Processing Waste and Non-coal
<br />Processin Waste N/A
<br />2.05.3(9) Retum of Coal Processing Waste to Abandoned
<br />Workin N/A
<br />2.05.4 Reclamation Plan V 9&10,
<br /> 719, 20, 21, 22 &
<br /> 25
<br />2.05.4 2 a Timetables V 9, T 19
<br />2.05.4 2 Reclamation Cost Estimates V 1Q T 25
<br />2.05.4(2)(c) Backlilling and Grading V 9, T 20 * Post-minutg
<br /> topography
<br /> 2.05.4 2 c
<br />2.05.4 2 To soil redistribution V 9, T 21
<br />2.05.4 2 e Rev elation V 10, T 22
<br />2.05.4(2)(f) Disposal of Debris, Add-forming and Toxic-
<br />formin Materials V 9, T 21
<br />2.05.4(2)(g~ Sealing ox Managing Mine Openings,
<br />E loradon Holes, Other boreholes or Wells V 8, T 18
<br />2.05.5 Post-Mining Land Uses V 10, T 22 *Post-Mining
<br /> Land Use
<br /> 2.05.5(1)(c) or
<br /> 2 c
<br />2.05.6 Mitigation of Impacts oFMining Operations V 8, 9 & 10
<br /> T-15, 16, 17, 18,
<br /> 20, 21, 22, 23, &
<br /> 24
<br />2.05.6 1 Air Pollution Control Plan V 1Q T 24
<br />2.05.6 2 Fish and Wildlife Plan V 10, T 23
<br />2.05.6(3) Protection of the Hydrologic Balance V 8, T 16, 17 &
<br /> 18
<br />2.05.6 4 Protection oEPublic Parks and Historic Places N/A
<br />2.05.6 5 Surface Miniu Near Und ound Minin V 6, T 12
<br />2.05.6(6) Subsidence Survey, Subsidence Monitoring and V 6, T 12
<br />Subsidence Control Plan
<br />
|