Laserfiche WebLink
Mr. Mike Boulay <br />Division of Minerak and Geohgy <br />Page 2 <br />Thete is another situation that could potentially affect the tuning and SCC's ability to maintain the <br />schedule for contemporaneous recLunation......The UMWA labor contract expires September 1, <br />2005. There is a potential for a work stoppage, however, the past two (2) UMWA contracts have <br />been successfully ratified without interruption to the operation. In SCC's case the UMWA members <br />at Peabody Western's Arizona operations outnumber the SCC union members and will probably <br />have the controlling votes in the decision. If a strike occurs, then SCC's ability to meet the <br />reclamation schedules will be severely hampered If this situation should happen, SCC will keep the <br />DMG informed and make all reasonable effort to maintain the approved schedules. <br />Following is a list of the sections of the Yoast perntit document that will be revised or updated to <br />address the new plan. <br />• Tab 1, Permit Sutmnary <br />- Update permit history <br />• Tab 2, General Policies <br />- Update list of preparers <br />• Tab 3, Adjudication File <br />- update Attachments and Appendicies <br />• Tab 12, Coal Resource Recovery Plan <br />- Update text <br />- Revise Exhibit 12-1, Operations Plan <br />• Tab 13, Facilities <br />- Update postmine drainage designs -text/SEDCAD/exhibits <br />- Locate and design proposed stock ponds <br />• Tab 19, Reclamation Schedule <br />- Update text <br />- Revise Exhibit 19-]A, Backfilling & Grading <br />• Tab 20, Backfilling and Grading <br />- Update text <br />- Revise Exhibit 20-2, Post-Mine Topography <br />- Revise Exhibit 20-2A, Pre/Post Mining Cross Sections <br />- Revise Exhibit 20-2B, Post-Mine Channel Profiles <br />Tab 22, Revegetation Plan <br />- Update text- revise reclamation standards <br />- Revise Exhibit 22-1, Postmine Vegetation <br />