My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-17_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-04-17_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:48 PM
Creation date
11/21/2007 9:07:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
4/17/2003
Doc Name
Phase IV Leak Detection Fill
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder Associates Irtc. <br />44 Union Boulevard. 8uire 300 <br />Lakewood, CO USA 80228 <br />Telephone (303) 980-0540 <br />Fax (303)985-2080 <br />August 29, 2002 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: PHASE IVb LEAK DETECTION FILL <br />Deaz Ron: <br />~. <br />r'~SSOClc'~t'.S <br />Our Ref: 003-2203 <br />Golder Associates Inc. (Golder) has prepazed this letter to address the recent failing gradation <br />for Leak Detection Fill (LDF) in the Phase IVb Area. The gradation test in question was <br />conducted by Golder on August 22, 2002 for LDF used to backfill the Phase IVb LDT. The <br />results of the gradation tests are attached to this letter. As shown, the LDF gradation is within <br />the Golder specifications for this material, with the exception of the 3/8-inch sieve. The <br />Golder LDF specification at the 3/8-inch sieve is 40 to 70 percent passing. The results from <br />the gradation test show that the percent passing the 3/8-inch sieve is 23 percent. <br />Approximately 200 feet (the length of the LDT beneath the west PSSA end berm) of LDT <br />was constructed with this LDF. <br />The results from the LDF gradation indicate the placed material is coazser than the project <br />specification. An LDF material that is coarser than the specification will not impact the <br />performance of the LDT. Therefore, Golder will accept the LDF placed in the LDT beneath <br />the west PSSA end berm. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson <br />Project. Please contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />John F. Lupo, Ph.D., P.E. <br />Sr. Project Manager <br />JFL/dls <br />cc: Bob Nichols, Golder Associates <br />I?D0~2zoTa100~003-zzo3.o10o.o4s]akakacNBZa.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.