My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03125
DRMS
>
Back File Migration
>
Revision
>
REV03125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:55 AM
Creation date
11/21/2007 9:06:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
3/16/2001
Doc Name
TRAPPER MINE PN C-81-010 TR 88 2000 ANNUAL REPORT APPENDIX W
From
TRAPPER MINING INC
To
DMG
Type & Sequence
TR88
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />TRIAPPBR ~tN~Na ZNC. <br />March 13. 2001 <br />Mr. Tom Kaldenbach RECEIVED <br />Colorado Division of Minerals and Geology <br />1313 Sherman St., Room 215 MpR ~ ~ 2001 <br />Denver, CO 80203 <br />Division of Minerals and Geology <br />Dear Tom: <br />Subject: Trapper Miue (Permit No. C-81-010) Technical Revision TR-88 <br />2000 Annual Report, Appendix W <br />Trapper Mine's Annual Report for 2000 is composed of seven sections. Section (.0 reports 2000 <br />reclamation activity as specified in Section 2.04.13 of the Colorado Mined Land Reclamation Board <br />Regulations for Coal Mining. All appropriate maps are enclosed. <br />Section 2.0 is the Annual Hydrology Report and is composed of eight subsections. <br />2.1 Climatological Data <br />2.2 Pit Dewatering and Consumptive Water Use for 2000 <br />2.3 Mining Advancement and Ash Disposal <br />2.4 Monitoring Points <br />2.5 Hydrological Data (Hydro-Engineering Inc. report) <br />2.6 Hydrological Trends <br />2.7 Spoil Spring Sampling <br />2.8 WET Testing Results <br />Section 3.0 is a report on Trapper's drainage reconstruction efforts 1987-2000. It consists of a <br />narrative segment describing our reconstruction methods and results as well as a map showing the <br />locations of our drainage reconstruction efforts minewide. In 2000, approximately 4,900 feet of <br />drainage construction work was performed in the Oak drainage. Drainage repair work was <br />completed on approximately 500 lineaz feet of the Johnson and No-Name drainageways during the <br />2000 field season. <br />Section 4.0 is the recontoured spoil sampling section. This section includes site specific spoil <br />analysis data and a map showing spoil texture and sample identification numbers for the Ashmore and <br />Flintlock pits <br />Section 5.0 is a narrative and map showing topsoil stockpiles conswcted in 2000 and proposed 2001 <br />topsoil stockpile locations. Additionally, the map has been updated to show all existing topsoil <br />stockpiles minewide with appropriate identification numbers. The narrative and accompanying Table <br />5-1 describes topsoil stockpile locations, size and approximate volumes. <br />Section 6.0 is the stock tank and dour basin section. This section contains a narrative and a map of <br />stock tank and dozer basin locations. Table 6-1 reflects the revised as-built stock tank density. <br />P.O. Box 187 Craig. Colorado 81626 (970) 824-4401 <br />
The URL can be used to link to this page
Your browser does not support the video tag.