My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-04-20_REVISION - M1977484
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977484
>
2004-04-20_REVISION - M1977484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:35 PM
Creation date
11/21/2007 9:06:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977484
IBM Index Class Name
Revision
Doc Date
4/20/2004
Doc Name
Submittal
From
Baca County
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />C.F. and R.M. Cooper Trust Pit #7 <br />Mining Plan <br />A. The material will be moved by front-end loaders and trucks. A bulldozer will be <br />used in locations where a loader is impractical due to loose footing. <br />B. The topsoil and subsoil will be removed by front-end loader and bulldozer and <br />separately stockpiled for use in reclamation. After mining moves toward the North and <br />East, as the topsoil is stripped it will be placed on regraded areas. <br />C. There will be no water diversions and impoundment's necessary at this pit, all <br />dikes and berms will be for safety and erosion control. <br />D. The area to be disturbed at any one time should not exceed 10 acres. <br />E. Mining will start with this permit and continue sporadically during the years as <br />required. Reclamation will be ongoing as the site is mined. The active area to the East <br />will be continued until exhausted, active mining will move to Northeast and East. <br />Reclamation will proceed as mining moves Northeast and East with topsoil and planted <br />with native grasses with ground sloped 3:1 where necessary. <br />F. Material to be mined is gravel and sand of varying depth from zero to 3 foot of <br />topsoil overburden. Straight below material is rock and will not be disturbed. <br />G. The primary commodity will be gravel for use as road surfacing and the <br />secondary commodity will be clay for use as roadbed materials. <br />H. There will be no refuse, acid or toxic producing materials exposed during mining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.