My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03103
DRMS
>
Back File Migration
>
Revision
>
REV03103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:53 AM
Creation date
11/21/2007 9:06:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
3/15/2006
Doc Name
Summary of Adequacy Review
From
DMG
To
File
Type & Sequence
TR105
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />File name: cost summary 1 page.xls <br />Dale: 3/152006 <br />in` <br />PBrmlI NO. C-$0-OUT <br />Mine name: West Elk <br />TASK LIST (DIRECT COSTSt <br />Task no. Task description <br />Colorado Division of Minerals and Geology <br />Reclamation Cost Summary <br />Preparee by: TK <br />Permlt or)ob acllon: TR~105 <br />10b Seal two monitoring holes at RPE vent shaft <br />11o Demolish structures at RPE vent shaft site <br />12m Concrete caps on Deer Creek vent and escape shafts <br />13d Push fill onto concrete caps <br /> Fleet <br />Form Used <br /> Size <br />borehole.xls 1 <br />tlemolish 1 <br />mineseal.xls 1 <br />dozer 1 <br />SUBTOTAL <br />Date: 3/14/2006 <br />county: Gunnison <br />Task Direct Cost <br />Hours <br />8 $ 2,734 <br />24 $ 8,011 <br />32 $ 5,110 <br />0.62 $ 92 <br />64.62 $ 15,947 <br />Indirect Costs <br />Contractor's overhead & profit <br />Liabiliry insurance: 2.02% %of direct costs total = $ 322 <br />Performance bond: 1.05% %of dired costs total = $ 167 <br />Job superintendent: 0.46 hrs. at $ 32.25 per hour total = $ 15 <br />Profit: 10.00% %of direct costs total= $ 1,595 <br />DMG project management <br />Engineering work and/or bid preparation: 4.25% °/ of direct costs $ 678 <br />Redamation management and/or administration: 3.25% % of dired costs $ 518 <br />Contingency 0 %of direct costs $ - <br /> Total indired reclamation costs $ 3,295 <br />Total performance bond amount (tlired casts plus intlired costs) $ 19,242 <br />
The URL can be used to link to this page
Your browser does not support the video tag.