Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br /> <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task p: -08'S'00~ State :Colorado PermiVjob p: M-1987-027 <br />Dale : f f/07i2000 County :Custer Abbreviation ; none <br />User: JDr Sile :Hardship Lode Filename: M027~003 <br /> <br />Pertnil or other job action :Final Reclamation <br />Task description :RIP PII f100! <br /> <br />HOURLY EQUIPMENT COST Basic machine :Car OBN (r996) Horsepower : 285 <br />Blada type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : I per day <br />Attachment no. 2 :3-shank upper <br /> Utilization % Cosl data source : (CRG) <br />Cost Breakdown : Ownership cosVhour: 34130 NA <br />Operahng cosUhour: 355.90 r00 <br />Ripper op. cosUhour: 36.94 100 <br />Operator cosUhour: 323. t2 NA <br />Total unit cosr/hcur: 3127.26 Total lleet cosUhr : $727,26 <br /> <br />MATERIAL QUANTITIES <br />Selected esamatinq method : <br />Afea <br />Seismic <br />metho0 : NA NA Load lactor: NA Bank volume : fVA BCY <br />Area <br />method: 6.50 Acres Rip depth (H): 7.00 volume: 10,487 BCY or CCY <br />Source of quantity takeroN :program <br /> <br />Source of material load lactor : NA <br />HOURLY PRODUCTION ' <br />i~mi - methotl : Material seismic velocity : NA feet per second <br />Unadlusted houry protluction : NA BCY or CCY/hr <br />Area method : Aveage ripping tlepth per pass : 1.00 feel <br />Average ripping width per pass: 7.08 feet <br />Average nppng length per pass : 300.00 leer <br />Average velocity of machine : 88.00 feet per minute <br />Average machine maneuver hme /pass : 0.25 minutes <br />Houdy production per unit area : 0.800 acres per hour <br />Unadlusted houry production : 7.289.94 BCY or CCV/hr <br />Correction lactors : Unadlustetl houry pmtlunion : 1.289.94 BCY or CCYmr <br />Sita alhtutle: 8,000 feet <br />Altitude adjustment: 1.00 (Caf HB) <br />Job efficiency lactor: 0.83 (f shJVdayJ <br />Nel lob conernon : 0.83 multiplier <br />Adjusted houry unit protluction : 1,070.65 BCY or CCY/hr <br />Adjusted hourly fleet protluction : 1,070.65 BCV or CCYmr <br /> <br />JOB TIME AND COST <br />Fleet size : 7 Dozers) <br />Total job lime : <br />9.79 <br />Hours <br />unit cost : so. t Is /LCY Total lob cost : $1,246 <br />