My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-12-08_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2000-12-08_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:20:23 AM
Creation date
11/21/2007 9:05:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
12/8/2000
Doc Name
CERTIFICATION OF 3 DAM SEEP WATER PIPELINES HENDERSON MILL PN M-77-342
From
DMG
To
CLIMAX MOLYBDENUM CO
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11111 1191111/ill <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80?03 <br />Phone: 003) 866-]567 <br />FAX: 0031 83?-8106 <br />December 8, 2000 <br />Mr. Erich Bower <br />Climax Molybdenum Company <br />19302 County Road 3 <br />Pazshall, CO 80468 <br />RE: Certification of No. 3 Dam Seep Water Pipelines, <br />Henderson Mill, Permit No. M-77-342 <br />Dear Mr. Bower: <br />DIVISION OF <br />MINERALS <br />G EOLOGI~ <br />RECLAMATION <br />MINING•$Af ETY <br />bill Owes <br />Governor <br />Greg E. Walther <br />E.ecmrve Direnor <br />Michael B. loop <br />Dlvis~on Director <br />The Division has received Mike Lsy's statement of certification and the pipeline pressure testing results <br />for the twin 3-Dam seep water pipelines at the Henderson Mill. This letter will serve as the Division's <br />acceptance of the certification as required by Rule 7.3.2(3) of the Hazd Rock/Metal Mining Rules and <br />Regulations of the Mined Land Reclamation Boazd. The pipelines are Environmental Protection Facilities <br />as defined in the regulations and may now be placed into service in accordance with Rule 7.3.1(5). 3-Dam <br />seep water will be managed during the next several months under the winterization plan described in the <br />Division's inspection report dated November 14, 2000. A statement on the functionality of the 3-Dam <br />pump station is pending to complete the documentation for the winterization plan. Final certification of <br />all aspects of the 3-Dam project must be provided upon completion of the project during 2001. <br />If you have any questions, please contact me. <br />Sincerely, <br />~~~ <br />Allen C. Sorenson <br />Rec]amation Specialist <br />c:\wlndows\personalUenderson TR-9 certification.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.