Laserfiche WebLink
,/ <br />~~ <br />Idr~w item 1. <br />F <br />i) <br />~l/S~~ O <br />~0 ~ !tp'j~/°ul <br />re~~/r~~ r <br />y ~2~01•ai~'~ a 6 . <br />7 r ~~ y.~...a,H r <br />~ s,f a~ <br />C,s 1 ~ ~dli <br />• <br />Th,: ;i.3 m.c.f. c~.E blasting wa:; calculat,ed <br />using the south, west, and north highwalle <br />length. Thies total length is 3500'. This <br />yields a blasting, pattern o1 :3500 X i5 X <br />L5. W}rir_h equals 3..3 m.c.£. or ':37,850 tone. <br />The origlnal rJrawing of the reclam4t:.:_. <br />bles_in~ shows r.hat. there will ire only one <br />bench blasted- i. a. the entire highwall. <br />'a~,~. lotions: <br />~ti+•~'.um-• ~i a triangle = 1~`[ExH:cL <br />(350n x 75 x 25)!?. .~.:3 mef. <br />3..3 mcf c~~ 165ss:cf. fey 2000u /t~,n = 2.37,890 <br />tons. <br />'There wi].1 be nn stockpiling of the <br />ov©rburden itop 10") orat.erial. This mat.er~a1 <br />will t,a spread over the reclaimed highwalls <br />a'•~i be used far £i11 on t}'ie qu• floor. <br />7..•.. ..,verburdert mates•ia? ntr~ the <br />~L shoulder note,+. <br />_u amatior~ ,resting would cove,• ~.,he <br />floor ar.e.a that remair;a ,;pan during active <br />mining. <br />The ha_,1 trucks will k,e used to haul the <br />~ topsoil replacement. sad the toF.soil tc+ the <br />areas ro k;e reclaimFC1_ <br />our c~.:er mining <br />F This; cost figY,r~ <br />arable heuling •~t <br />ions <br />F E+ 2 <br /> <br />