My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02869
DRMS
>
Back File Migration
>
Revision
>
REV02869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:36 AM
Creation date
11/21/2007 9:04:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
3/31/1999
Doc Name
DMG OSM PERMITTING COORDINATION TWENTMILE COAL CO THE FOIDEL CREEK MINE CMG PN C-82-056 MR-163
From
DMG
To
TWENTMILE COAL CO
Type & Sequence
MR163
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iiil <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem o(Natural Resources <br />1713 Sherman SL, Room 215 <br />Denver, Colorado 80203 <br />Phone. 0031 866-7567 <br />FA%: 1303) 872-8106 <br />March 31, 1999 <br />Rick Mills <br />DIVISION O F <br />MINERALS s. <br />GEOLOGY <br />RECLAMATION <br />MI NING•SA FETY <br />B~II Owens <br />Governor <br />Twentymile Coal Company Greg E. Walther <br />291 ~ Routt County Road 27 EsecmiveDireaor <br />Michael B. Long <br />Oak Creek. CO 80x67 Division Director <br />Re: DNIG/OSM Permitting Coordination, Twentymile Coal Company, The Foidel Creek <br />Mine, DMG Permit No. C-82-056, Minor Revision No. MR-163 <br />Dear Mr. Mills: <br />The Division received your application for Minor Revision No. MR-163 on March 26, 1999. <br />This MR requests approval to widen the Third Right gate road, install the Second Right sump, <br />and describe the Fish Creek Borehole discharge treatment system. No change in reclamation <br />liability is anticipated at this stage of our review. <br />I discussed the intent of this MR with Larry Kline at OSM last week. Based on the current <br />description of the MR, OSM has determined that this IvfR is a revision that does not require <br />modification of your OSM mine plan. <br />Sincerely, <br />Daniel I. Hernandez <br />Senior Environmental Protection Spectaltst <br />Cc: Larry Kline, O5NI <br />Janet Binns, OSIvt <br />At \ossV RC\M R 163 Cg'_8i6 dnc <br />
The URL can be used to link to this page
Your browser does not support the video tag.