I <br />Southwest District Ventilation Borehole. Powerline and Access Road <br />The Southwest District Ventilation Borehole, Powerline and Access <br />Road will require a minor amount of work in order to reclaim the <br />sites. The work includes: building & duct work removal, fan <br />removal, demolition of concrete pads, removal of concrete, sealing <br />top of casing, powerline and pole removal, road removal, topsoil <br />replacement, and seeding. <br />It is anticipated the ventilation shaft, and access road will have <br />a useful life of approximately three years, or until the last panel <br />in the SW District has been mined out. After this occurs the <br />building, duct work, and fan will be removed from the site. <br />Likewise, the powerline and poles will be removed. Until final <br />reclamation commences, the borehole will be temporarily sealed as <br />described within the response to Rule 2.05.4(2)(g). At the time of <br />final reclamation, the concrete pads will be broken up and the <br />concrete removed from the site. The material will either be hauled <br />to the refuse site for disposal or hauled to a land fill. <br />Final reclamation of the thirty-six inch diameter casing will <br />involve placing a plug at the bottom of the cased hole, cementing <br />the cased hole from the plug to within three feet of the surface, <br />backfilling the top three feet of the hole with available material, <br />topsoiling, and seeding the site. Alternatively, the cased hole <br />may be selectively cemented by placing a cement plug 20 feet above <br />and below the water bearing units (i.e. Wadge Overburden, <br />Twentymile Sandstone). The remainder of the cased hole would be <br />filled with a grout. As above, the top three feet of the casing <br />would be cut off and the hold backfilled with soil. The access <br />road, unless it is to remain after mining, will be graded to blend <br />in with the surrounding topography and the culvert will be removed. <br />The ventilation borehole pad and access road will be topsoiled and <br />seeded with the appropriate seed mixture. <br />TR 94-17 2.05-55(b)(1) Revised 5/26/94 <br />