Laserfiche WebLink
L.G. EVERIST, INC ~ <br />Rock Solid Since 1876 <br />dba Andesite Rock Company <br />January 25, 2006 [~ <br />Mr. Carl Mount <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />RECEIVED <br />JAN 2 7 20~ ~ <br />Division of Minerals and Geelegy <br />MOUNTAIN DIVISION OFFICE <br />7321 E. 60TH AVENUE • SUITE 200 <br />HENDERSON, COLORADO 80640 <br />303-267-9606 <br />FAX 303-269-1346 SL <br />CORPORATE OFFICE <br />300 S. PHILLIPS AVE. • SUITE 200 <br />P.O. BOX 5829 <br />SIOUX FALLS, SD 57117-5829 <br />PHONE 605-334-5000 <br />FAX 605-334-3656 <br />Denver, CO 80203 ~~ ~ ~ <br />RE: Request for elease of Pertormance and Financial Warranties <br />Fort Lupton Sand and Gravel Mine, DMG Permit M-1999-120 <br />Dear Mr. Mount: <br />As owner and operator of the Fort Lupton Sand and Gravel Mine, L. G. Everist, Inc., respectfully <br />requests a partial release of the performance warranty and financial warranty ($477,500) <br />associated with the construction of the slurry wall liner. <br />We have completed the slurry wall liner around of the original permitted area of the Fort Lupton <br />Sand and Gravel Mine. We have received approval of the lining from the Office'of the State <br />Engineer. The approval letter is attached. We are continuing to mine out the sand and gravel <br />reserves within the slurry wail, so this is just a partial release request. <br />As required in the Construction Materials Rules, Rule 4.16.1(2), following is the name, address, <br />and phone number of the owner of record of the affected land. <br />L. G. Everist, Inc., Corporate Office <br />300 S Phillips Avenue, Suite 200 <br />P.O. Box 5829 <br />Sioux Falls, SD 57117-5829 <br />605-334-5000 <br />L. G. Everist, Inc., Mountain Division Office <br />7321 E. 88'" Avenue, Suite 200 <br />Henderson, CO 80640 <br />303-286-2247 <br />We look forward to a partial release of the warranty. If you have any questions, please feel free <br />to contact me directly at 303-286-2247 or via email at lemayer@Igeverist.com. <br />Also, as I mentioned last week, we will be sending in a Technical Revision request to bond for <br />new mining phases very soon. If the DMG would like to calculate the two financial warranty <br />changes (the partial release and the TR additional bond) and then just do one transaction for <br />the difference, that is fine with us. <br />Sincerely, <br />~~~ ~L~ <br />Lynn M er Shults <br />Regula ry Manager <br />cc: Dennis Fields <br />John Henkhaus <br />~~oHe <br />~610>- lzo~b <br />LM/FL-FinWarReleaseRequest-DMGCM-Ot2506.doc -Sent via Certified Mail # 7002 0860 0006 1860 3960 <br />