Laserfiche WebLink
EXX7-IIBIT D, T.W. Ratlifl'Pit ~!8• ~E~.'~~VE:® <br />Mining Plan SEP 1'.0 2001 <br />Division of Minerals and Ceolopy <br />a) the material will be moved by front-end loaders and tn~cks, a bull dozer will be used in <br />location where loader is impractical due to loose footing <br />b) the overburden will be moved by front-end loader and bulldozer and stockpiled <br />for use in reclamation <br />c) there will be no water diversions and impoundment's necessary at this pit, all <br />dikes and berms will be for s.~d'ety and erosion control <br />d) the area to be disturbed at any one time will not exceed 40 acres <br />c) mining will start with this permit and continue sporadically during the years as required, <br />reclamation will be on going as the site is mined, active mining will move to Southeast <br />corner of site and reclamation will begin in northwest corner, southeast corner will be <br />mined going to the east until exhausted, reclamation will proceed as mining moves to the <br />east with topsoil stored on-site to be planted with native grasses with ground sloped 4;1 <br />where necessary <br />f) (i) material to be mined is gravel and sand oCvarying depth with none to 3 R of topsoil <br />overburden <br />(ii) stmiglit below material is rock and will not be disturbed <br />g) ll~e primary commodity will be gravel Cor use as road surfacing and the secondary <br />commodity will be clay for use as road bed materials <br />h) there will be no refuse, acid or toxic producing materials exposed during <br />mining <br />i) northern part of this pit is pre-law and will not be disturbed <br />