My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-29_REVISION - M1984043 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984043
>
2007-01-29_REVISION - M1984043 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:55 PM
Creation date
11/21/2007 9:02:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984043
IBM Index Class Name
Revision
Doc Date
1/29/2007
Doc Name
Conversion Approval
From
DRMS
To
Pelino, Inc.
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMEM7 sheet 2 of 2 <br />Machine Tota! Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) ~ Cost/hrHleet I Cost/hr/neet <br />-Light Duty Pickup, 4x4, 3/4 T $46.30 1 $48.30 $46.30 <br />-Fuel Tanker, 4x2, 170 HP $54.11 1 $64.11 $64.11 <br />-Luke Truck, 4x2, 170 HP $72.01 1 $72.01 $72.01 <br />$182.42 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Buena Vista <br />Transportation CVCle Time : Non- I Tatar one-way travel distance : 10.0 miles <br />Radable Radable Average travel speed :_ 45.0 mph <br />Haul time (hours) = 0.22 0.22 <br />Return time (hours) = 0.22 0.22 <br />loading 6me (hours) = 1.00 NA <br />Unloading time (hours] = 1.00 NA <br />Subtotals = 2.44 0.44 <br />Total non-roadable mob/demob cost' <br />' Mo round 61pa with haul rlg <br />Total roadable mob/demob cost " <br />"one rourW bip, no haul rig <br />$3,352.58 <br />$81.07 <br />JOB TIME AND COST Total job time : 4 89 hours <br />Total job cost : 53.434 <br />......................... . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.