Laserfiche WebLink
<br /> <br />These stages represent some changes in the original permit plan. <br />Stage 1, north of the rivet, remains the same. The new stage <br />2 includes a dewatering trench along the southwest of the parcel <br />of East Rigden which lies south of the railroad tracks. As <br />part of stage 2, this trench will be extended along the south <br />of the Morrison and Baumgartner parcels in order to drain into <br />the Poudre. Stage 2 also includes mining the west section of <br />East Rigden south of the tracks. Stage 3 includes dewatering <br />and mining the east section of East Rigden south of the tracks. <br />Stage 4 includes dewatering and mining all of the Baumgartner <br />parcel. Stage 5 includes dewatering and mining Morrison south <br />of the railroad. The new stage 6 includes dewatering and mining <br />land at East Rigden north of the railroad and south of the Poudre. <br />Stage 7 includes dewatering and mining Morrison north of the <br />railroad and south of the river. Some of these stages represent <br />more than one year's activity; it may prove convenient to divide <br />a stage and dewater and mine one part of it before dewatering <br />the rest of it. <br />Depth of Ore Body and Underlying Stratum <br />The gravel deposit lies 6 to 14.5 feet thick below an over- <br />burden .5 to 8 feet deep. Pierre shale bedrock Iies approxi- <br />mately 10 to 19 feet below the ground surface and extends to <br />a depth of about a mile. <br />Proposal for Ditch Across County Land <br />This application includes a request to Larimer County to allow <br />D-4 <br />