My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02559
DRMS
>
Back File Migration
>
Revision
>
REV02559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:12 AM
Creation date
11/21/2007 9:02:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
6/9/1994
Doc Name
GOLDEN EAGLE MINE PN C-81-013 MR APPLICATIONS
From
BASIN RESOURCES INC
To
DMG
Type & Sequence
MR55
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14300 Highway 12 <br />Weston, Colorado 81091 <br />(719)868-2761 <br />Purchasing (719) 868-2768 <br />Fax (719)868-2275 <br />BASIN <br />RESOURCES, ~N~. <br />a subsidiary of ENTECH, Inc. <br />June 8, 1994 <br />Mr. Joseph Dudash ~•'r "=' ~ -, <br />Colorado Division of Minerals and Geology <br />1313 Sherman, Room 215 -'UN 3 1994 <br />Denver, CO 80203 <br />L~roi,, <br />ulr Ci F:Ip CI dIJ u I.:CL 6j(~'. <br />RE: Golden Eagle Mine; Permit C-81-013 <br />MR Applications <br />Dear Mr. Dudash: <br />Enclosed are two MR applications for structures to be built at <br />the Golden Eagle Mine. The first structure is a baffle to be <br />installed at the 3rd North Fan. The baffle will suppress the low <br />frequency noise generated by the fan which, although are within <br />legal limits for noise levels, have caused some complaints from <br />local residents. This baffle should eliminate the perception of a <br />"noisy" fan. <br />The second MR application is for the construction of a rail <br />loadout oa the existing track. This will consist of relocation of <br />the existing loadout surge bin to a position approximately 200' <br />West of the current truck loadout. Aa additional conveyor belt <br />structure will be constructed to connect the truck with the rail <br />loadout structures. <br />Bonding calculations and a revised facility list are included <br />with maps showing the location of the structures. Please call if <br />you have any questions. <br />Sincerel <br />i <br />Ralph Lopez <br />Environmental Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.