Laserfiche WebLink
<br />Mr. James C. Stevens <br />August 6, 2001 <br />Page Three <br />5. Onsite Structures <br />Response: <br />The onsite structures at S-4 consist of the processing plant and accessory facilities, <br />such as an office, a scale, and a scalehouse, etc. TR-002 does not involve these <br />structures, their use, location, or future disposition once mining and processing are <br />completed. Therefore, the removal of said structures cannot possibly be germane to <br />this Technical Revision. <br />The operator has a considerable investment in the plant and equipment at [hev <br />S-4 facility and fully intends to remove all equipment and structures, mobile or not, <br />in order to fully reclaim the site and obtain the release of then reclamation bond. <br />Demolition costs are estimated to be $5,000.00. <br />6. Relationship of Reclamation Plan with Possible Master Plan <br />Response: <br />Regarding [he question of consistency of the S-4 Reclamation Plan with a <br />"Master Plan" for Sand Creek, Arapahoe County has no such plan that the operator <br />is aware of. <br />This letter attempts to fully respond to the "adequacy issues" raised by the <br />Division if you have questions regarding the above, please do not hesitate to contact me. <br />Sincerely, <br />C~-r~~~~ <br />Michael L (Mike) Hart <br />cc: Bruce Peterson <br />Brent Brockemeier <br />