My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02465
DRMS
>
Back File Migration
>
Revision
>
REV02465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:00:05 AM
Creation date
11/21/2007 9:01:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/17/1998
Doc Name
CRESSON PROJECT PN M-80-244 PERMIT AMENDMENT APPLICATION 7
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
DMG
Type & Sequence
AM7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />approved valley leach capacity of 65 MM tons would be achieved based on current and <br />anticipated production rates. Construction of the extension of the valley leach facility needs to <br />begin in 1999 and be completed in 2000 to provide the capability of continuing the current <br />operations. The valley leach facility consists of about 31 acres that would be added to the <br />approved operating leach facility. <br />us know of any questions such that we may expeditiously respond. Thank you for <br />Environmental Affau•s <br />ures (8): Permit Amendment Application ("Number 7") <br />1. Volume 1: <br />Part 1: Exhibits ("A"-"T") <br />Part 2: Permit Application <br />Part 3: ERP/SPCC Plan <br />2. Volume 2: <br />Part 1: Golder Associates, June 1998, "Cresson Project Valley Leach Facility Expansion <br />Phase III Design -Volume 1." (Appendix 1) <br />3. Volume 3: <br />Part 1: Golder Associates, June 1998, "Cresson Project Valley Leach Facility Expansion <br />Phase III Design -Volume 2" (Appendices) (Appendix 1) <br />4. Volume 4: <br />Part 1: JBR Environmental Consultants, Inc., April 1997, "Baseline Data Collection <br />Cripple Creek & Victor Gold Mining Company, Cripple Creek Mining District, Teller <br />County, Colorado." (Appendix 2) <br />Part 2: Matheson Mining Consultants, July 1997, "Cripple Creek & Victor Gold Mining <br />Company Ground Vibration Attenuation Studies -Ajax and Ridge Road Mining Areas" <br />(South Cresson and East Cresson). (Appendix 3) <br />Part 3: Adrian Brown Consultants, Inc. (ABCI), "Main Cresson Mine -Slope Stability <br />Evaluation," "East Cresson Mine -Slope Stability Evaluation," and South Cresson Mine <br />- Slope Stability Evaluation" (Appendix 4) <br />5. Volume 5: <br />Part 1: Golder Associates, "Overburden Storage Facility Stability and Hydrology <br />Evaluation Cresson Project Teller County, Colorado" June 15, 1998 (Appendix 5) <br />6. Volume 6: <br />Part 1: Shepherd Miller, Inc. and ABCI, "Executive Summary - Hydrologic, <br />Geochemical, and Ground Water Impact Evaluations -Cresson Mine Expansion -Cripple <br />Creek Mining District, Colorado;" "Hydrologic Evaluation -Cresson Project Expansion - <br />Cripple Creek and Victor, Effects of Geochemical Processes on Cazlton Tunnel Water, <br />Cresso^ Mine, Cripple Creek Mining District,Colorado;" Effects of Geochemical <br />Processes on Carlton Tunnel Water, Cresson Mine, Cripple Creek Mining District, <br />
The URL can be used to link to this page
Your browser does not support the video tag.