My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-07-13_REVISION - M2000016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-07-13_REVISION - M2000016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:41:17 PM
Creation date
11/21/2007 9:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
7/13/2005
Doc Name
exhibit g water information
From
lafarge
To
dmg
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.en. By: AFFLEGATE GROUP, INC.; <br />Mr. Richard T. Raines <br />Aprit 2, 2001 <br />Page 4 <br />303a5266tt; Nova-Oa 9:32AFS; Pace 6112 <br />12. In accordance with amendments :o Section §25-8-202-(7), C.R.S. and ~Sertate Gilt 89- <br />181 Rules and Regulations' adopted on February 4, 1992, the State Engineer shall <br />determine if this substitute water supply plan is of a quality to meet requirements of use <br />to which the senior appropriation receiving the substitute supply has normally been puk <br />As such. water quality data or analyses may be requested at any time to determine if <br />the requirement of use of the senior appropriator is :net. <br />13. Acceptance of these conditions is assumed unless a letter to the contrary is received by <br />this office, the Division 1 Engineer (Richard Stenzel; 800 8'" Avenue, Suite 321, Greeley, <br />CO 80631) and the District 2 Water Commissioner (Robert Stahl, 9378 Weld County <br />Road 25, F[. Lupton. CO, 80621) within two weeks ~f your receipt of ibis letter. <br />Please contact Joanna Williams of this office or Mr. Dave Nettles, in Gr9eley at (970) 352-8712, if <br />you have any questions concerning this approval.. We con;,lude that approval of this substitute <br />water supply plan does not imp~y a position by this office on airy related iifiga6on. <br />Sincerely, <br />Attachment <br />Kenneth W. Knox <br />Assistant State Engineer <br />cc: Richard Stenzel, Division 1 Engineer <br />Robert Stahl, Water Commissioner, Water Dlstrid 2 <br />Duane Bo(tig, Lafarge <br />Julie Goettemoeller, Lafarge <br />David Bailey, Massey Semenoff Stern & Schwarz, PC <br />Gary Witt, Wright Water Engineers, Inc. <br />C:\01 1-00 910 0 0dif1Raines Ft,LuptonPit SSP <br />
The URL can be used to link to this page
Your browser does not support the video tag.