My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-07-13_REVISION - M2000016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-07-13_REVISION - M2000016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:41:17 PM
Creation date
11/21/2007 9:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
7/13/2005
Doc Name
exhibit g water information
From
lafarge
To
dmg
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAFARGE <br />NORTH AMERICA <br />Construction Materials <br />MITIGATION <br />3.1 Trigger Points <br />The groundwater mitigation plan will be triggered when two consecutive monitoring events <br />indicate that the groundwater level has dropped two (2) feet or more below the seasonal water <br />level for that period, as determined by baseline monitoring data, or when any single monitoring <br />event indicates that the groundwater level has dropped two (2) feet below the seasonal low, as <br />determined by baseline monitoring data. <br />If a trigger point occurs, an impartial groundwater expert will perform an analysis and submit a <br />written report to the Division and potentially impacted parties within thirty (30) days. The <br />analysis and report will determine the cause of the impact and the mitigation required. <br />3.2 Proposed Mitigation Measures <br />One or more of the following mitigation measures will be used to alleviate off-site groundwater <br />impacts. The exact measure or combination of measures will be determined by the Division, in <br />consultation with the operator, potentially impacted parties, and the impartial expect. The <br />operator shall pay the cost of mitigation. Mitigation measures will be implemented in the <br />following order, as necessary, to alleviate impacts to off=site wells: <br />• Delivering water by pumping and piping or by a drain system <br />• Deepening of impacted off-site wells <br />• Construction of new well or wells <br />• Delivery of replacement water by: <br />o Pumping dewatering water to the affected party(s) <br />o Pumping from the on-site wells <br />o Delivery from the Brighton Ditch shazes controlled by the operator <br />o Other sources as may be required <br />The impartial analysis will continue until the cause can be determined or the relative impact of <br />the mining operation can be calculated. When the Division agrees with the findings of the <br />impartial analysis, the mitigation may be adjusted accordingly. <br />LAFARGE NORTH AMERICA INC. -Lafarge ConstruUion Materials <br />10170 Church Ranch Way, Suite 200, Westminster Colorado 80221 <br />Telephone: (303) 6574000 Facsimile: (303) 657-4037 <br />
The URL can be used to link to this page
Your browser does not support the video tag.