Laserfiche WebLink
-3- <br />STIPULATION N0. 20 <br />WITHIN SIX MONTHS OF THE FINAL APPROVAL DATE OF THIS REVISION, THE <br />PERMITTEE WILL SUBMIT A DETAILED DESIGN PLAN FOR THE COAL MINE WASTE <br />DISPOSAL STRUCTURE AS REQUIRED BY RULE 2.05.3(8)(ii). CONSTRUCTION OF <br />THE STRUCTURE WILL NOT BEGIN UNTIL THE DIVISION HAS APPROVED THE DETAILED <br />DESIGN, IN WRITING. <br />STIPULATION N0. 21 <br />IN ORDER TO MONITOR THE VOLUME OF COAL MINE WASTE MATERIAL DISPOSED OF IN <br />THE APPROVED PILE, THE STRUCTURE WILL BE SURVEYED BY A QUALIFIED <br />REGISTERED ENGINEER DURING EACH QUARTERLY SITE INSPECTION REQUIRED BY <br />RULE 4.10.2. THE PERMITTEE WILL SUBMIT A COMPLETE PERMIT REVISION <br />APPLICATION ADDRESSING ALTERNATIVE COAL MINE WASTE DISPOSAL PLANS BEFORE <br />THE VOLUME OF MATERIAL IN THE APPROVED PILE EXCEEDS 10,000 CUBIC YARDS. <br />IF NO ALTERNATIVE WASTE DISPOSAL PLAN IS APPROVED, MINING OPERATIONS WILL <br />CEASE WHEN THE APPROVED DISPOSAL PILE VOLUME REACHES 15,000 CUBIC YARDS, <br />AND THE PERMITTEE WILL INITIATE AND COMPLETE RECLAMATION OF THE ENTIRE <br />MINE SITE WITHIN SIX MONTHS OF THE CESSATION OF MINING. <br />A noncontiguous portion of the proposed permit area in Lacy, Colorado, is not <br />being proposed for approval at this time. Prior to further consideration for <br />approval of the site, the applicant and Division must provide for public <br />notice and an opportunity for public comment in accordance with Rule 2.07.3. <br />This permit revision relieves the applicant of the obligation to complete <br />reclamation by December 10, 1440. <br />