My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02336
DRMS
>
Back File Migration
>
Revision
>
REV02336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:57 AM
Creation date
11/21/2007 8:59:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
5/15/1995
Doc Name
KERR COAL CO MARR MINE PN C-80-006 TR 12 FOR PARTIAL BOND RELEASE MAP 47A
From
TERRAMATRIX
To
DMG
Type & Sequence
TR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_- ~- TerraMatrix <br />Engineering & Environmental Services <br />1475 Pine Grove Road • PO Box 774018 <br />Steamboat Springs, Colorado 80477 <br />303-879-6260 • fax 303-879-9048 <br />uiiiiiiiiiiiiu iii <br />RECEIVED <br />hIAY 15 1995 <br />May 12, 1995 <br />(via FedX) <br />Division of mmerais a neology <br />Mr. Wallace Erickson <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />Re: Kerr Coal Company - Marr Mine (Permit No. C-80-006), Technical Revision TR-12 for <br />Partial Bond Release (Map 47A) <br />Dear Mr. Erickson: <br />In conjunction with the letter dated May 9, 1995 from Mr. Jim Cooper of Kerr Coal Company <br />(Kerr), please find enclosed three copies of a map (Map 47A, Actual Reclaimed Topography (720 <br />Pit Partial Bond Release) delineating the area for which Kerr is requesting that you proceed <br />immediately with Phase 1 partial bond release. As noted in the May 9 letter, this area is a <br />component of the larger area covered by the pending Phase 1 bond release request submitted <br />on March 15, 1994. Kerr requests that you proceed with Phase 1 release of the bond associated <br />with the 720 Pit area as a distintt component at this time only because of delays in resolving <br />separate bond release issues relating to the Pit 1 area. <br />It should be noted that Map 47A does not supersede the previously submitted Map 47 but rather <br />serves as a supplement. Consistent with the terms of the DMG/OSMRE/Kerr Settlement <br />Agreement and the recently approved technical revision (TR-13), Kerr plans to initia[e <br />supplemental backfilling and grading work in the Pit 1 area as soon as site conditions allow and <br />anticipates that the DMG will also proceed with processing of the remaining components of the <br />1994 bond release request in a timely manner. We appreciate your continuing responsiveness <br />and cooperation. Please feel free to contact me with any questions regarding this submittal. <br />Best regards, <br />TerraMatrix for Kerr Coal Company <br />Jerry M ettleton <br />n <br />cc: J. Cooper/EFC Denver <br />G. Patterson/Kerr <br />R. Fanyo/Dufford & Brown, P.C. <br />OS/IL95 Ipm Steamboat Springs, CO • Denver, CO • Fort Collins, CO • Seattle, WA. Juneau, AK • Santiago, Chile SA <br />
The URL can be used to link to this page
Your browser does not support the video tag.