My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02275
DRMS
>
Back File Migration
>
Revision
>
REV02275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:54 AM
Creation date
11/21/2007 8:59:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Revision
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J , III IIIIIIIII IIII III <br />999 <br />Here is what's in my file regarding alternate post mine land use at the Meeker <br />Mine. There area couple of documents missing but, the story is there. In a nut <br />shell, AFO issued a TDN saying that retention of an 1800 square foot concrete <br />pad and an adjacent gravel parking pad for possible use as a mobile home site in <br />support of the landowner's guided hunting business was illegal without the area <br />being designated as an alternate post mine land use. DMG eventually agreed <br />and required the permittee to revise the post mine land use. An alternate land <br />use of recreation was approved. <br />10/27/92 Fritz's inspection report <br />Fritz was alone on his inspection because he missed DMG's earlier bond release <br />inspection. <br />He discusses a "yard" with a mobile home sized concrete pad and gravel <br />parking area. There was also a power pole, electric switch box, transformer and <br />PVC pipes sticking out of the ground. Fritz asked if these structures were to be <br />left after bond release. <br />He discusses an MR approved 9/11/85 addressing retention of structures at the <br />landowner's request. Fritz said he needed more information. <br />He said he did not concur with request for Phase 2 bond release without several <br />additional pieces of information requested in his report- one of which is the item <br />above. <br />1!25/93 OSM letter to DMG <br />Regarding the concrete pad area, OSM said, "The landowner's request clearly <br />indicates that these areas are to be used for residential/recreational uses. This <br />constitutes an alternative post mining land use which is in conflict with the <br />approved post mining land use of grazing/wildlife." It also says, "This area, the <br />office complex, will have to be reclaimed or the mine plan must be revised and <br />approved, in accordance with Colorado's approved program, to reflect the new <br />land use." <br />3!12(93 OSM letter to DMG <br />Letter says, "Finally, AFO's letter of January 25, 1993, indicated that the office <br />complex in the Northern No. 1 Mine would have to be reclaimed or the mine plan <br />revised and approved, in accordance with Colorado's approved program, to <br />reflect the new land use proposed for the retained facilities <br />(residential/recreational)." <br />
The URL can be used to link to this page
Your browser does not support the video tag.