Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATE OF COLU1~vU <br />DIVISION OF MINERALS AND GEOLOGY <br />Dep. nmenl of Natural Resources <br />I }17 Sherman 51.. Room 215 <br />Dcnver, Colorado 80'_03 <br />Phone: 17071 8hh~ 3567 <br />FAX: 130]1 8J2~8117h <br />August 1, 1997 <br />John Husband <br />US Bureau of Land Management <br />Little Snake Resource Area <br />1280 Industrial Avenue <br />Craig, CO 81625 <br />Re: Final Phase II/III Bond Release Inspection, Meeker Area Mines, C-81-032 <br />Dear Mr. Husband: <br />II~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />tames 5. Lochhead <br />Executive Director <br />Michael B. Long <br />Division Dneaor <br />The purpose of this letter is to advise you of a final Phase I[/III Bond Release inspection (Inspection) of <br />the Meeker Area Mines (Northern # 1 and Rienau #2) scheduled for 1:00 pm on Thursday, August 14, <br />1997. The Inspection will be conducted by the Division of Minerals and Geology (Division), and will <br />begin at the Northem # I Mine identification sign on State Highway 13 between Meeker and Craig <br />(approximately one mile south of the summit of Ninemile Gap pass). The Inspection applies to a request <br />for release of remaining coal mine reclamation bond moni~... . <br />The State of Colorado holds bonds for reclamation of disturbed areas at coal mines in Colorado. The <br />Meeker Area mines are permitted by the Division under Permit Number C-81-032 (Permit) to the Enron <br />Coal Company (Enron). The original reclamation bond was for $850,000. Rules of the Colorado Surface <br />Coal Mining Reclamation Act (Rules) permit progressive release of reclamation bonds. A percentage of <br />the bond may be released (a Phase I release) for backfilling and grading, and an additional percentage (a <br />Phase 1[ release) for establishment of vegetation, which supports the approved postmining land use. <br />Disturbed surface areas of the mines were backfilled, regraded and reseeded in 1986 and 1992. Phase I <br />and Phase II releases reduced the reclamation bond to $184,071. By letter of May 7, 1997, Enron <br />submitted a request for a final Phase I[/III bond release at the Meeker Area Mines. The request was <br />considered complete for filing after receipt of proof of publication of the request in The Meeker Herald. <br />The Inspection will be conducted to determine, in part, if release of the remaining $184,071 is <br />appropriate. Inherent with granting of the request is the termination of Permit C-81-032 and any <br />jurisdiction by the Division. As a manger of lands within the Permit area, an invitation is extended to you <br />tojoin the Division in this inspection. Please call me at 303-866-4941 if you have any questions <br />concerning the inspection, reclamation work, or bond release at the Meeker Area Mines. <br />Yours truly, <br />Byron G. Walker <br />Environmental Protection Specialist <br />Certified Mail: P 213 351 923 <br />r <br />