Laserfiche WebLink
III IIIIIIiIIIIII III U. ~ DEPT. OF THE ~RIOR <br />a~ ~~ <br />_,___ m <br />a OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />• ~.. ,, • Mine-Site Evaluation Inspection Report <br />~gery ~ se <br /> 10. Type <br />1. Pumittee/Person : , ,- ~ 9. Permit Number a. pemrit b. RA <br /> ENERGY FUELS MIMNG CO. C-055-82 PP aS <br /> 2. Address Q~~ 1 6 ~9y~ Il. InspecaonDate 12. InspecaonType l3. Jointlnspection <br /> cIoALLENWEAVER, 11/30/93 SPl ~N YiN <br /> 3. City 4. State 14. Permit Status 15. Site Status 16. Facility Type <br /> FLORENCE CO ~ ~ BE <br />S. Zip Code 6. Phone Number 17. OSM Office q 18. RSf k 19. Land Code <br />81226 -~ 303-846-9251 020 <br />7. Operator if Different than Pemlit[ee 20. M.S.H.A. ID H 21. State Code 22. County Code <br /> <br /> 05-0325 ~ 071 <br /> 8. Mine Name 23. AV S Permiuee Entity ID Number 23b. Stau Office <br /> <br /> RATON CREEK MIIVES 091988 ~ ~ <br /> <br />24. Performance Standard Categories <br />Codee:l=Com liar 2=Noncom Banc 3=Not Plann 4=Not S =Noncom fiance Identified Elsewhere <br />A. Administrative D. Balling & Grading H. 3 Subsidence Control Plaa <br />1._Mining within Valid Petmit 1. 3 Exposed Openings I. Roads <br />2._Mining within Bonded Area 2 1 .Comemporaneous Reclamation 1.~Raad Conswction <br />3._Tams ~ Conditions of Permit 3 _Approximate Original Contour 2.~Catitication <br />4 _Liability Insrttattce 4. 3 Highwall Elimination 3.~Draulage <br />5.__,Ownetship and Control- ---.5..~,Steap.Skrpys (includes dosvnslope) _ -. <br />d.~Stufacing and Maintenance = - <br />6._Temporary Cessation 6. 1 Handbag of Acid & Toxic Materials 5. 3 Rxlarnadon <br />B. Hydrologic Balance <br />7. 1 Stabilzation (rills and gullies) <br />I. 2 Drauulge Control E. Excess Spoil Disposal J. Signs & Markers <br />2.~Irrspections & Cepcations 1._Placement 1. 1 Signs <br />3._Siltation Structures 2._Drainage Control 2. 1 Markers <br />4._Discharge Structures 3._Surface Stabilizadon K. 1 Distance Prohibitions <br />5._Dive+sions 4._Inspections & Certifications - <br />Effluent Limits <br />6. L. Revegetation <br />- <br />7.~Ground Water Monitoring F. Coal Mine Waste 1. 4 Vegetative Cover <br />8.-Surface Water Monitoring (Refrrse Piles/Impoundments) 2._Timing <br />9._Drairfage -Acid-Toxic Materials 1. 3 Drainage Control <br />10._hnpoundments 2.~Surface Stabilization M.-Pastmining Land Use <br />Stream Buffer Zones <br />11. 3. 3 Placement <br />_ 4. 3 Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5. 3 Impounding Struc[trres <br />1.-Removal G. Use of Explosives -1) <br />2._Substitute Materials 1. 3 Blaster Ctxtification <br />2) <br />3._S[orage and Protection 2, 3 Distance Prohibitions - <br />4.-Redistribution 3. 3 BlastSmvey/Schedule <br />3) <br /> 4. 3 Warnings & Records ' <br /> 5. 3 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Dme al last <br />I~pedunp~ / / <br />4S a Permit Review a Total <br />1600A tended <br />Frequency for previous 4 Calendar Qtrs. b ~~ I 1333.0 a Pemutted <br />b. Number of Number of <br />m~np~ete ~0 irk ns ^p 1.0 b. Inspection Time 0.0 released <br />34.0 b. Disnabed <br />utspadioris mnduded <br />T <br />l Ti <br />6.0 c. Phan II <br />0.0 released (Estimated) <br />c Number al Number of c. <br />rave <br />me <br />required ^ psra~d . ^ <br />0 <br />d 0 <br />~p ~ <br />6.0 d <br />R <br />rt Writi ~ d Phase lII <br />0'0 <br />d <br />l <br />Page <br />m <br />ude <br />qrs . <br />epo <br />ng ease <br />re •.,,r, m <br />