Laserfiche WebLink
<br />5. 'The location of the seismic analysis lines is in an area of known instability. We are <br />concerned that the proposed blasting may have a negative impact in this area. If more <br />than three (3) pounds of explosives per SO ft. center are detonated, PWCC must notify <br />the Division. <br />The reclamation cost estimate and revised performance bond liability are adequate as <br />submitted. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br /> <br />Susan L Morrison <br />Reclamation Specialist <br />SLM\051993.WP <br />ary en t 2 ay 1 , 1993 <br />