Laserfiche WebLink
IIIIIIIIIIIIIIIIIII a ~_~~-~~~ <br />~~/iS~oC ID ~ <br />RECEIVED/ %-y~ <br />SEP 2 319 <br />~~/~ ~a ~\\, Civision of Minerals 8 Geology <br />' ~'~` <br />•, ~, - <br />September 20, 1 <br />ENERGY COMPANY <br />Ms. Sharn E. Smith p.O. BOX 16] GOIDE N, COLORADO 80404 <br />Reclamation Specialist <br />Division of Minerals and Geology <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />RE: Technical Revision 30, Keenesburg Mine <Permit C-81-028) <br />adequacy and defect corrections <br />Dear Sharn: <br />As discussed, find attached changes to Technical Revision 30, <br />Reclamation Plan, rhich reflects Coors Energy Company's current and <br />suture plane. In addition. TR-30 corrects defects found throughout <br />the permit, rhich re discussed in our last meeting. Replace pages as <br />follore: <br />• Table of Contents, VOLUME I. rhich reflects historical data <br />in Appendix C - 1 <br />• 2.04.7 HYDROLOGY DESCRIPTION, pages 58 thru 64, page <br />eequence correction <br />+ 2.04.10 VEGETATION INFORMATION, PAGES 78 thrul93A page <br />sequence correction ,_~{,/jly~}'~n,tt/~t~~~. ~A 4~'N,~-1-1 ov. \ol1~i'~~I <br />+ 2.05.3 OPERATION PLAN HISTORICAL INFORMATION, in front of <br />letter addressed to Mr. Dan Matheva !approximately page 108) <br />• 2.05.4 RECLAMATION PLAN. pages 113 thru 113b and 115 thru <br />117 <br />• 2.05.4 RECLAMATION PLAN historical information after page <br />123d <br />IS there are queBtion or you disagree, please call <br />Re ctfully <br />Jacl Epple <br />Ope atione Manager <br />