C~
<br />•
<br />-6-
<br />Location 1n Aoolication
<br /> INFORMATION CATEGORY NARRATIVE -' S
<br /> 8_1 8
<br />8-3 8-~
<br />2.05.3(3) Mine Facilities Volume 1, Section 4-1, 6A-lA to H, t
<br /> 2.05, pages 12-47A 6A-4, 6A-5A to M,
<br />2.05,3(4) Ponds, Impoundments and Volume 1,. Section -
<br /> Diversions 2.05, pages 47A-50 Map Nos. 8A=1,
<br />2.05,3(5) Topsoil (removal and Volume 1, Section Map Nos. 8-1, 6A-l
<br /> storage) 2.05, pages 50-51 6A-2A to G.
<br />2,05.3(G) Overburden Volume 1, Section Map No. SA-8
<br /> 2.05, pages 51-52
<br />2.05.3(7) Coal Handling Structures Volume 1, Section
<br /> 2.05, pages 52-53
<br />2.05,3(8) Coal Processing Waste and Volume 1, Section Map Nos. 8-1, bA-1
<br /> Non~oal Processing Waste 2,05, pages 53-54 to G
<br />2.05,3(9) Underground Development Volume i, Section Waste Disposal App
<br /> Haste 2.05, page 54 -
<br />2,05.3(10) Return of Coal Processing Volume 1, Section
<br /> Haste to Abandoned 2.05, page 55
<br /> workings
<br />2,05,4 Reclamation Plan Volume 1, Section
<br />2.05,4 (2)(a) Timetables Volume 1, Section Map Nos. 9A-2A to
<br /> 2.05, pages 56-60
<br />2.05,4(2)(b) Reclamation Cost Estimates( Volume 1, Section
<br /> 2.05, page 60
<br />2.05.4 (2)(c) Backfi111ng and Grading Volume 1, Section *PostaniningMap N
<br /> 2.05, page 60 topography -
<br /> 2.05.4(2)(c)
<br />2.05.4(2)(d) Topsoil (Redistribution) Volume 1, Section Map Nos. 6A-5A to
<br /> 2.05, pages 60-67 to G, 8-6, 8-7, 8A
<br />2.05.4(2)(e) Revegetation Volume 1, Section
<br /> 2.05, pages 67-76
<br /> Volume 1, Section
<br />2.05,4 (2)(f) Disposal of Debris, Acid- 2.05, page 76
<br /> Forming and Toxic-Forming
<br /> Materials
<br />;-
<br />- _
<br />ti
<br />i
<br />8-G, 8A-]u'
<br />.A-2A to G,
<br />6A-6, 6A-7,
<br />to 9C, 8A-1
<br />to l4, and
<br />9A-2A to D. .
<br />Atoll, S
<br />A to H, 6A-2
<br />Yoi . 6A
<br />D
<br />~s. 6A-5A t~
<br />M, 8-1, 6A-2
<br />8
<br />
|