My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV02007
DRMS
>
Back File Migration
>
Revision
>
REV02007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:34 AM
Creation date
11/21/2007 8:57:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
1/30/1992
Doc Name
REQUEST FOR BOND ESTIMATE FOR TEMPORARY REFUSE WASTE PILE AND REQUEST FOR BOND AMOUNT TO BE CONDITIO
From
MLRD
To
ADRIAN BROWN CONSULTANTS INC
Type & Sequence
TR8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1373 Sherman St.. Room 2i5 <br />Denver, CO 80203 <br />303 866-3567 <br />FAX~303 832-8106 <br />STATE OF COLORADO <br />OF ~~( <br />tip'.; //.~~ ~~~9 <br />tit: ~`3ltIF1r ~p <br />0 <br />~;; , <br />~ re 76 ~ <br />Roy Romer. <br />Governor <br />January 30, 1992 <br />Attn: Mike Galloway <br />Adrian Brown Consultants, Inc. <br />155 So. Madison Suite 240 <br />Denver, CO 80209-3014 <br />Fretl R. Banta. <br />Division Dnector <br />Re: Request for bond estimate for temporary refuse waste pile and, <br />Request for bond amount to be conditional - Stipulation 22 <br />Coal Ridge No.l Mine (C-84-065) <br />Dear Mr. Galloway: <br />Enclosed are the bond calculations that you requested per our <br />telephone conversation Tuesday, January 28, 1992. The calculations <br />are based on the use of a program developed by the Division for the <br />sole intent of accounting for reclamation estimation. The attached <br />cover letter recommends an additional $29,354.00 be posted to cover <br />the estimated reclamation costs. <br />In lieu of your request to postpone the bond amount on the <br />temporary refuse pile until operations begin and the need arises, <br />the Division has added the stipulation that bond be conditional <br />upon the commencement of refuse accumulation at the mine. <br />Stipulation 22, attached to Technical Revision 08, addresses this <br />issue. I have enclosed a copy of the stipulation with the revised <br />decision for your review. <br />Please feel free to contact me should you have any questions or <br />wish to discuss any additional issues concerning Coal Ridge No.l. <br />Sincerely, <br />-l. <br />Shawn E. Smith <br />Reclamation Specialist <br />cc: Larry Routten <br />
The URL can be used to link to this page
Your browser does not support the video tag.