Laserfiche WebLink
<br />Base Products <br />Tony F. Appelhanz <br />62339 W. LaSalle Rd. <br />Montrose, CO 81401 <br />970-249-3061 <br />E7CFIiBft D <br />MINING PLAN <br />P~ ~ <br />~ Receives <br />NpV 1 ~ 20~ <br />Divis~o~ of Mee ids ~OGep ~ <br />My intent is to do each area one at a tlme, provided your interpretation will allow me to <br />open up the next area before reclamation is complete on the one Just Ilnished. I need this to <br />eliminate the possibWty of an interruption of gravel sales. <br />The two gulches you refer to, will be almost nonexistent when all gravel Is removed. <br />However, both have established outlets for water that will not need any additlonal work for <br />runoff. These two wW need culverts to cross haul road to keep water channeled into outlets <br />that have been used for this purpose in past years. <br />Handling of Debris: I spoke to you by telephone concerning this material. Since it is <br />permissible to burn it, this would permit removal to small amounts as needed, and not expose <br />surface to blowing. <br />The unsellable material I refer to is shale. This can be used as subsoIl and applied to pit <br />Iloor before topsoll is applied. Hopefully this material will not be In large quantltles above gravel <br />deposits and can be blended into pit Iloor. <br />1 intend to maintain a 3:1 slope on material mined until removal for fence is complete. if <br />this operation cannot be coordinated as planned, their will be enough material in place for ridge <br />reclamation at least on my side. <br />As (or mining the pit Iloor deeper. Yes, f intend to go deeper at least in some areas. To <br />stay out of the water the first time over, I doubt wID leave the pit Iloor very level, with a natural <br />grade in a northerly direction. The shale deposits will determine how this can be done without <br />excessive cost. After arriving at the North end of areas to be mined, and reclaimed separately, <br />this will be easy to determine. The irrigatlon seepage can then be directed azound each area, as <br />shown on maps, to the outlets that have been established before mining. <br />Compaction of pit Iloor will be no deeper below surface of pit Iloor, if mined deeper or IeR <br />as ls. Compaction is measured tram the remaining surface. <br />