Laserfiche WebLink
.. t' • <br />EXHIBIT L-Reclamation Cost Estimate <br />Doze tails from 1.5 day operation 5 1,889.05 <br />Push embankment of pond 1 to 4% slope E 13,208.00 <br />Finish grade 27 ac @ 5555.54/ac 5 14,999.58 <br />Topsoil 3.5 ac @ 0.5 ft. depth 5 126.00 <br />Rip 2.8 ac road @ 545/ac 5 126.00 <br />Seed 6.3 ac @ 50#/ac @ 52.50J# 5 787.50 <br />Fertilizer E5.00/50#; 6.8~ac @ 100#/ac ~ 68.00 <br />Seedbed prep 5.5 ac @ 543.00/ac S 150.00 <br />Seed and fertilizer application <br />6.8 ac @ E48/ac S 326.40 <br />Straw mulch 6.8 ac @ 2T/ac @ 560/T 5 816.00 <br />Crimp mulch 6.8 ac @ 533/ac S 224.40 <br />DIRECT COST SUBTOTAL S 33,855.93 <br />MOB/DEMOB <br />2 D-8L <br />2 627D <br />1 12G <br />1 S,000g wtr truck <br />4 lowboy trailers <br />4 hours total @ 4 trucks @ 575.77/hr 5 1,212.32 <br />DIRECT COST SUBTOTAL 5 35,068.25 <br />Indirect costs @ 15.8% <br />(Public liability costs, contractors <br />performance bond, engineering, <br />contract prep, bid spec., contractor <br />profit, foreman) 5 5,540.78 <br />SUBTOTAL 5 40,609.00 <br />ROUNDED TO 5 40,600.00 <br />SGR/eke/7283F <br />