Laserfiche WebLink
• <br />BOND RELEASE APPLICATION <br />SANTA FE LOADOUTS NO. 1 AND 2 <br />Page 2 <br />SUMMARY <br />• III IIIIIIIIIIIIIIII <br />Reclamation activities completed at the SF Loadouts, which are the basis for this Phase I, II, <br />and III bond release request, are listed below in order of completion on Table 1, Reclamation <br />Summary. <br />TABLE 1 <br />RECLAMATTON SUMMARY <br />Date <br />Completed <br />Reclamation Activity Completed <br />Area/ Volume <br />10/4/93 All coal handling equipment dismantled and removed n/a <br />from sites. <br />12/1/93 Excess road and coal base materials hauled from sites 2,000 ccy <br />(all coal base material hauled to Raton Creek Mine). <br />12/15/93 Regrading of both sites complete. n/a <br />1!15!94 Drainage control installation complete, including silt n/a <br />fences at both sites. <br />418/94 Rerriain;ng concrete pads/footers removed and hauled n/a <br />from site. <br />