My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01832
DRMS
>
Back File Migration
>
Revision
>
REV01832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:24 AM
Creation date
11/21/2007 8:55:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987116
IBM Index Class Name
Revision
Doc Date
11/8/2000
Doc Name
COST SUMMARY FORM
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Date: Oi-Sep-2000 <br />User: JD1 <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no.: M-1987-116 <br />Abbreviation : none <br />Site : Sisken <br />State :Colorado <br />County :Custer <br />Filename. M116-000 <br />Agency or organization name : DMG <br />Permit or job action :linal reclamation <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -grade highwalls to 5:1 dozer 1 180.0 $17,226 <br />002 -replace topsoil dozer 1 4.0 $425 <br />003 -rip pit floor dozer 1 13.0 $1,339 <br />004 -reseed disturbed areas revege 1 40. $7.083 <br />005 -mob/demob equipment mobilize 1 4. $878 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 2Q 1. $26,951 <br />' includes inllation lactor adlusimenl of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />TOTAL DIRECT COST' ~ $26,951 <br />1.55 °o of direct total = $418 <br />1.05 % o/ direct total = $283 <br />120.50 hrs'...$/hr.~ $32.25 total = $3.886 <br />10.00 % of direct total = $2,695 <br />-assume net hours = 50°0 0! task hours TOTAL O 8 P = $7,282 <br /> CONTRACT AMOUNT (direct + O 8 P) _ $34.233 <br />PROJECT MANAGEMENT - <br />Engineering work and/or contracUbid preparation : 4.25 % of colt. NA total = $1,455 <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $1,712 <br />coNrINGENCV - NA' NA total = NA <br />"conlingenc~es accounted for al task level TOTAL INDIRECT COST= $10,448 <br />TOTAL BOND AMOUNT (direct + indirect) _ $37,399 <br />2v ti asp su '$ 3 7,'~eo <br />
The URL can be used to link to this page
Your browser does not support the video tag.