Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> Agency or organization name : DMG <br /> <br />Task p : 001 State : Coloredo Pennifljoba : M•1967-116 <br />Date: I1/08r2000 County :Custer Abbreviation :none <br />User: JDl Site:Siskin Pir Filename:M116-001 <br /> <br />Perm it or otherjob action :Final Reclamation <br /> <br /> Task description :grade hlghwells to 5:1 slope <br /> <br />HOURLY E QUIPMENT COST Basic machine :Cat D8N (1996) Horsepower : 285 <br /> Blade type :Universal <br /> Attachment no. 1 : ROPS Cab ShiN basis : 1 per day <br /> Attachment no. 2 : NA <br /> Util¢aVOn % Cost data source : (CRG) <br /> Cost Breakdown ~ Ownership cosMour: $35.37 NA <br /> Operating cost/hour: $55.90 100 <br /> Ripper op. cosVhour: $0.00 NA <br /> Operator cosUhour: $23.12 NA <br /> Total unit cosUhour: $11d.39 Total !teat cosUhour: $114.39 <br /> <br />MATERIAL <br />Initial QUANTRIES <br />Swell <br />Loose <br />volume: 45,556 CCY !actor: 1.345 volume: 6!,273 LCY <br />Source of quantity take~oH :calculation <br />Source of est. swell factor :program <br />Average push distance : 100 lest <br />Unadjusted hourly production : 964 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gadient : 10.00 n; (ne9) <br />Average sae altitude : 8,300 feet <br />Material weight : 2.600 Ibs/LCY <br />Material weight description <br />I imnnnnn - FrnLnn <br />JOB TIME AND COST <br />Fleer size : 1 Dozers) <br />Unit Lost : $0.183 /LCY <br />~JOb Cond'ron Correct on Factors <br /> Source <br />Operator skill : 0.75 (avg.) <br />Material consistency: 7.00 (Cat HB <br />Dozing method : 1.20 (sloe) <br />'. Visibility: 1.00 (avg.J <br />Job eNiciency : 0.83 /1shiR/da <br />Spoil pile : 0.80 (Ind-d) <br />Push gradient : 1.22 (Ca1 HB <br />Altaude: 100 (Cat RB <br />Material weight : 0.88 (Car HB, <br />Blade type : 1.00 /S or UJ <br />Net correnion : 0.65 <br />Atljusled unit production : 624.15 LCY/Tr <br />Adjusted Ileet production : 624.15 LCY/hr <br />total job lime: 98.17 Hours <br />Total fob cost : $11,230 <br />