Laserfiche WebLink
• Ltr/Mt. Gunnison No. 1 Mine - 2 - June 18, 1986 <br />6. The applicant should submit a plan for controlling seepage along <br />conduits placed in the pond and a contingency plan for controlling <br />ground water seepage into the pond. <br />7. How does the applicant plan to construct the emergency spillway? WECC <br />should define what material will be used for construction and where <br />will it come from? <br />8. The applicant should provide a narrative of how the manual valve <br />dewatering pipe will function. lJill the valve be within arms reach <br />from the embankment? Will it be submerged or above water storage level? <br />9. Attachment D should contain the boundary and acreage of the area to be <br />drained by Pond MB-5. <br />10. Attachments G and D should be certified, with appropriate seal, by a <br />licensed professional engineer. <br />If you have any questions, feel free to call me or Tom Schreiner. <br />Sincerely, <br />~ ~~~>~. ~C~YL <br />Susan Mowry <br />Reclamation Specialist <br />SM/dlm <br />Enclosure(s) <br />1377E <br /> <br />