Laserfiche WebLink
<br />t <br />exceed 21,000 feet, and the remainder of the panels are approximately 18,000 feet or less. The mine layout is <br />shown on Map 23, Mine plan. <br />As shown on Map 23, 10 Right and 9 Right arc the northern most gateroad and panel, respectively. The <br />gateroads and panels will be mined in a southerly direction which will allow for gravity drainage away from the <br />panel. <br />Panels 8 Rigltt and 9 Right, which are in this flue year permit term, will result in the undermining of Routt <br />County Road 33, power lines, telephone lines, Foidel and Middle Creeks, and the limited alluvial valley floors <br />associated with these creeks, and the Southern Pacific railroad spur servicing the mine. In reference to the 9 <br />Right panel, it will be approximately 18,000 feet in length and will barely nick the southwest comer of the <br />established Foidel Creek AVF. Panel 8 Right will see limited activity located within the boundary of the <br />existing Middle Creek AVF. The undermining of these structures/features will be discussed in more detail in a <br />following section. During the subsequent five year permit term, mining will occur beneath private structures. <br />and those structures are shown on Map 23B, Structures and Renewable Resource. <br />EMD and Northern Minine District <br />The mining that is to occur in the remainder of the Eastern Mining District and the Northern Mining District is <br />located in areas previously discussed in Permit Revision 93-03. The area to be mined in this five-year permit <br />term is sliovvn on Map 23, Mine Plan. The five-year area is readily identified by the color-coding used in <br />creating the map. The mining layout, i.e. panel widths, gateroad dimensions, and cross-cuts, will be the same as <br />provided in PR 93-03, except that the dimensions may be based upon mining conditions encountered in the new <br />area. Also, the barrier width or location between entries in the northeast submains and the northeast mains may <br />vary based upon [Wining or geologic constraints. <br />During the five-year term, longvvall mining will be conducted under County Road 33, povverlines, Foidel. <br />Middle. and Fislt Creeks, the Fish Creek AVF, UP Railroad (Energy Spur), residences owned by the Ashleys, <br />and a pond and ditch owned by the Ashleys. Amore detailed discussion of undermining these structures will be <br />presented in a later section. During subsequent five-year terms, undermining of Fisli Creek and its AVF will <br />continue; these features are shown on Map 23B, Structures and Renewable Resources. <br />PR 97-04 2.05-10(d) Revised 3/26/97 <br />