Laserfiche WebLink
<br />March 27, 1995 <br />Ms. Janet Binns <br />Page 2 <br />Given that both SAE's drainage and sediment control designs are certified by a registered P.E. <br />and that the designs include EFCI's rnmmitment to sampling and upgrading the drainage and <br />sediment control system if effluent levels are exceeded, a separate P.E. statement would represent <br />unnecessary dupliation. <br />In addition to the noted revisions, EFCI has mrretted the two typographic errors indicated in <br />Mr. Duduh's memo. Pleue feel free to contatt me if the department hu any questions or <br />requires additional information. <br />Sincerely, <br />TerraMatrix Inc. ,r~ ~~ /~ <br />'~'Tliomai E. Leidich " " t <br />Projett Engineer <br />attachments (3) <br />cc Al Weaver <br />J. Nettleton <br />