Laserfiche WebLink
III IIIIIIIIIIIIIIII ~ ~ <br />ECG NECi4 <br />~CoalCompany Seneca Coal Company <br />September 27, 1999 <br /> <br />Mr. Michael Boulay RECEIVED <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 1999 <br />Denver, CO 80203-2273 SEP 2 8 <br />RE: Yoast Miae Permit C-94-082, TR10 DivisionolMine~als8G~1o~ <br />Dear Mr. Boulay: <br />Enclosed please find three copies of revised material addressing <br />the application for TR10 to the Yoast Mine Permit C-94-082. This <br />technical revision addresses an increase in the reclamation <br />performance bond based on comments from the midterm review of the <br />permit. <br />Based upon the Division's calculations and review of the SCC cost <br />estimate a meeting was held in Denver on September 16th. The <br />• reclamation cost estimate has now been updated based on the <br />conversations and assumptions made, as well as the associated job <br />performance and cost component factors that are contained within <br />the estimate. Therefore, upon approval of this revised estimate, <br />SCC will submit the additional $400,000 in reclamation <br />performance bond to bring the total amount held by the Division <br />to $3,600,000. <br />Enclosed are the revised insertion instructions into the PAP, and <br />the updated materials. Should you or any other members of the <br />Division have any questions regarding this information, please do <br />not hesitate to contact me. <br />Sincerely, <br />`~Yl ~' Q ~ <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />c: John Husband (BLM) <br />Larry Kline (OSMRE) <br />• <br />Seneca Coal Company • P.O. Drawer D • Hayden, Coloratlo 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />