My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01712
DRMS
>
Back File Migration
>
Revision
>
REV01712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:17 AM
Creation date
11/21/2007 8:54:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/18/1992
Doc Name
COLOWYO COAL CO PERMIT RENEWAL PR APPLICATION PN C-81-019 AND EXCESS SPOIL FILLS
From
OSM
To
MLRD
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior <br />OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />Brooks Towers <br />1020 15th Street <br />Denver, Colorado 80202 <br />March 16, 1992 <br />Mr. Steve Renner <br />Colorado Mined Land Reclamation Division ~NAR18 ~gg~ <br />215 Centennial Bldg, 1313 Sherman Street <br />Denver, Colorado 80203 Mined hand <br />Reclamation ~,,,:_: _ , <br />Re: Colowyo Coal Company <br />Permit Renewal/Permit Revision Application <br />Permit No. ~- i-Oi9 and R::cess °pcil Fills <br />Dear Mr. Renner: <br />We have reviewed the modified information submitted by Colowyo <br />Coal Company on December 19, 1991 as follow-up to the <br />Colowyo/NERD/OSM meeting held on November 19, 1991. The modified <br />information does not fully address the concerns discussed at the <br />November 19th meeting, and the following information should be <br />submitted prior to permit revision approval. Please request this <br />information from the applicant. <br />The narrative should be expanded to explain how the <br />horizontal lifts would be constructed, including the <br />method for placing material, the equipment to be used, <br />lift thicknesses, and how the construction method meets <br />MLRD's horizontal lift requirement. <br />2. The construction plan should be expanded to include the <br />methodology for preventing void formation and for <br />achieving densities to ensure mass stability. The <br />construction plan should also include construction <br />drawings, a detailed narrative of the fill <br />construction, and a construction schedule for <br />appurtenances. <br />If you have any questions, please call Roger Baker at (303) 844- <br />2939 or me at 844-2546. <br />Sincerely, <br />`~ ~/ <br />G <br />Ranvir Singh, Chief <br />Federal Lands Branch <br />
The URL can be used to link to this page
Your browser does not support the video tag.